When a contractor needed to convert a 2D pump track concept into a 3D model ready for construction and GPS site setout, our team stepped in to build the design collaboratively with the client from the ground up. Working through grading, roller heights and drainage on a small, tightly interlinked site in Warragul, the project needed close attention to detail as one change flowed through every connected section of track.